Tel \ WeChat \ Whatsapp: +86 135 3288 4528

Work Time: Mon-Sat: 8:00am to 18:00pm

0

What this guide is for
This page helps buyers assemble the project information needed before evaluation: the detection or control target, mounting limits, interfaces, and operating conditions. Send that brief to GBeeLee for a first-pass review.

What to include in the project brief
1. Application or use case
2. What must be detected or controlled
3. Operating environment
4. Mounting and size limits
5. Electrical or communication interfaces
6. Signal or output type, if already known
7. Estimated quantity
8. Target timing
9. Existing drawings, samples or reference products
10. Items requiring engineering review

How to send it
Prepare the items above and send them to GBeeLee so the team can compare the brief with listed capabilities in a first-pass evaluation.

What still needs engineering confirmation
Final feasibility, dimensions, interfaces, samples and certification requirements should be reviewed for the specific project.

Explore related guidance
Sensor Capabilities and Product
Families Position & Motion Sensing

FAQ
What should a project brief include before evaluation?
A project brief should include: application or use case; what must be detected or controlled; operating environment; mounting and size limits; electrical or communication interfaces; required signal or output type, if already known; estimated quantity; target timing; existing drawings, samples or reference products; and items that still need engineering review. Send that package to GBeeLee for a first-pass evaluation.

Next step
Prepare the project brief listed on this page and send it to GBeeLee for a first-pass evaluation.